Network Installation

To keep up with the pace of up gradation in technology, the mobile operators and OEM’s are in continuous deployment of new telecom equipment’s which is mandatory to ensure the subscribers connectivity, coverage and quality. IWS ensures safe, timely installation & integration of the sites with quality and by honouring SLA for the clients.

IWS Implementation services includes a split of the stages as below

E-Node B Installation & Integration

E-Node Installation activities are carried out according to site specific installation plan and include:

  • Mounting and Installation of Poles and RF Antennas
  • Setting Azimuth and tilt as of the RF Antennas as per the planned data
  • Installation and termination of radio feeder cables, jumpers and grounding cable
  • Installation of e-node B (or extension rack), plug-in units and all internal cables
  • Installation of transmission cable, power cable and power system, Grounding cable and alarm cable for e-node B
  • Taking photographs and of the sites. VSWR meter check wherever required
  • Following Quality and Safety process/checklist throughout the work flow
  • Integration of the e-node B to ensure connectivity with the network
  • Test calls done in order to check alarm free site

Microwave Antenna Installation & Commissioning

MW Antenna Installation activities are carried out according to site specific installation plan and include:

  • Mounting and Installation of MW Antenna (0,3 mtr to 2.4 mtr MW Antenna) on near end and far end
  • Installation, routing and termination of MW cables and racks
  • Alignment of the MW antenna to get maximum efficient bandwidth
  • Commissioning of the MW antenna with the network to ensure connectivity

De-Installation, Packaging & Logistics

De-installation of the site, packing and transporting the equipment’s services include:

  • De-Installation of RF Antenna , RF, Jumper, Power Cables and accessories
  • De-Installation of MW Antennas and Cables
  • De-Installation of RF cabinet, MW racks and all cards
  • De-Installation of SMPS Unit
  • Packaging of equipment’s separately with wooden box/bubble cover , based on the size and weight of the equipment’s
  • Loading and unloading the equipment’s wherever required
  • Transportation of the equipment’s to the warehouse
  • Rec-conciliation of material submission at warehouse and acceptance